PLACEHOLDER ARTICLE — full copy to be supplied before launch.
Starting outside
[PLACEHOLDER COPY] Roof covering, flashings, eavestroughs, cladding, grading, and drainage set the tone for the entire inspection.
The major systems
[PLACEHOLDER COPY] Electrical panel and distribution, plumbing supply and drainage, water heater, furnace, and ventilation.
What isn't included
[PLACEHOLDER COPY] Concealed components, specialty testing, and areas that can't be accessed safely.

